FRAMINGHAM – The following are the scheduled road projects and utility projects in the City of Framingham for the week of July 20.

All projects will be conducted in conformance with the health and safety protocols set forth by the Commonwealth and the City of Framingham.

As the situation with COVID-19 is ever-changing, construction schedules are subject to change.

As work is weather permitting.

[broadstreet zone=”59982″][broadstreet zone=”59983″][broadstreet zone=”59984″]

Beaver Street Bridge: Bridge work continues. Beaver Street Bridge will be closed to through traffic and pedestrians until Fall 2020. A detour will be in effect at all times.

Bethany Road/Winthrop Street Crosswalk Improvements:
Crosswalk construction improvements continue at the intersection of Bethany Road and Winthrop Street. Expect minor delays.

Central Street Water and Sewer Design:
A City hired contractor will conduct geoprobe investigations on Kellogg Street. Expect minor delays.

Chestnut Street Gas Main Relay – Eversource Gas:
Eversource Gas will continue relaying gas main on Chestnut Street.A one-way alternating traffic pattern will be in effect. Expect delays at times.

Flagg Drive Water Main Replacement
: Water main installation continues. A one-way alternating traffic pattern will be in effect. Expect delays at times.

[broadstreet zone=”70106″][broadstreet zone=”70107″]

[broadstreet zone=”58610″]

Grant Street Gas Main Relay: Eversource Gas will begin relaying gas main on Grant Street. A one-way alternating traffic pattern will be in effect. Expect delays at times.

Hillcrest and Berkshire Water Main Replacement:
The Water Division will continue installing water main on Hillcrest Road. Hillcrest Road and Berkshire Road will be open to residents and emergency vehicles only.

Nobscot Intersection Improvements: Verizon will set new utility poles in preparation for the intersection improvements project. Expect minor delays at times.



Saxony Sewer Improvements: The Sewer Division will begin making sewer improvements near Saxony Road/Saxony Terrace. Expect minor delays at times.

Warren Road Gas Main Relay – Eversource Gas: Eversource Gas will begin relaying gas main on Warren Road.A one-way alternating traffic pattern will be in effect. Expect delays at times.