Meeting on Plans to Re-Design Route 9/27 Interchange

Share, email, print, bookmark SOURCE reports.

NATICK – MassDOT is proposing to redesign the the Route 9/27 intersection in Natick.

There will be a public meeting on the project on Thursday, June 10 at 7 p.m.

MassDOT proposes to design and construct a Modified Diverging Diamond interchange to replace the existing 1931-vintage cloverleaf.

The proposed design is intended to improve safety and travel conditions for all modes.

A presentation by MassDOT and Greenman-Pedersen, Inc., will be followed by public comment/Q&A

Zoom link for this meeting: bit.ly/NatickTAC

For comments/questions to the project team: Rt27Rt9Natick@dot.state.ma.us


editor

email: editor@FraminghamSource.com call or text at 508-315-7176


Notice: ob_end_flush(): failed to send buffer of zlib output compression (0) in /home/framin10/public_html/wp-includes/functions.php on line 5279

Notice: ob_end_flush(): failed to send buffer of zlib output compression (0) in /home/framin10/public_html/wp-content/plugins/really-simple-ssl/class-mixed-content-fixer.php on line 107