FRAMINGHAM – The following is a list of construction projects in the City of Framingham for the week of September 26, 2021.
The work is City of Framingham and utility projects.
All work is weather permitting.
[broadstreet zone=”59945″] |
Arlington Street Water and Sewer Improvements – Design Work: A City hired contractor will excavate to confirm utility locations for design work on Summit and Alexander Streets. Expect minor delays. Police details will be on-site to facilitate traffic.
Berry Street Gas Main Replacement: Eversource gas will continue replacing gas main on Berry Street. Expect minor delays. A one-way alternating traffic pattern will be in effect.
Carlson Road Water, Sewer, and Roadway Improvements: Water main installation. Expect minor to moderate delays. A one-way alternating traffic pattern will be in effect on Carlson Road and Glen Street. Also, at times, a one-way alternating traffic pattern will also be in effect on Beaver Street and Kendall Avenue.
[broadstreet zone=”58893″] |
Edgell Road and Edmands Road Gas Main Replacement: Eversource gas will continue replacing gas main on Edgell Road and Edmands Road. Expect moderate delays. Lane shifts and/or a one-way alternating traffic pattern will be in effect.
Grove Street Roadway and Drainage Improvements (Between Edmands Road and Winch Street): Drainage work continues. Expect moderate delays. A lane shift, detour, and/or one-way alternating traffic pattern will be in effect.
Nobscot Intersection Improvements: Underground and aerial fire alarm cable work continues. Culvert work continues. Expect minor delays. Police details will be on-site to facilitate traffic as needed.
[broadstreet zone=”59984″] |
Roadway Maintenance – Crack Sealing:
A specialized contractor will crack seal the following roads: Franklin Street, Dudley Road, Potter Road, and Brook Street. Expect minor delays. Police details will be on-site to facilitate traffic.